Preparation

6.1

Assembly and sitting

22
Operation with external loads
(Circulating thermostat) continue at ( 6.5).
 Check whether the pump connectors at the side and back are fitted with seal-
ing caps ( Section 3) or that hoses are fitted for external loads.
 With bath temperatures over 70 °C the supplied self-adhesive label
should be applied on the bath at an easily visible point.
 Do not carry out technical changes on the device!
 The unit can safely operate up to an ambient temperature of 40 °C.
Preparation
Proline Edition X heating thermostats
 Site the unit on a flat surface
 The unit must not be put into operation if its
temperature during storage or transport has
dropped below the dew point.
Wait for about one hour.
 Do not cover the ventilation openings at the
back of the control head.
 When used as a bath thermostat put the by-
pass valve in "internal" position (without "ex-
ternal load") ( 3).
YACE0099 / 10/9/2018