Installing The Gateway; Installation Flow - H3C SecPath M9000-AI Manual

Table of Contents

Advertisement

2

Installing the gateway

Installation flow

Figure 2-1 Installation flow
Start
Prepare for
installation
Rack-mount the
gateway
Ground the gateway
Install cable
manag ement bra ckets
Install modules
Install fan trays
Install power
supplies
Connect signal
cables
(Optional) Install air
filter doors
Check before and
after power-on
Operating
correctly?
Yes
End
Inspect the gateway
Read safety
guidelines
Examine the
installation site
Pre pare insta llati on
tools an d a ccessories
SEMs and switching
fabric modules
Interface modules/service
modules and interface
switch modules/AI security
engine modules
DC power supplies
AC power supplies
HVDC power
supplies
Troubleshoot the
gateway
No
Power off the
gateway
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e8Secpath m9000-ai-e16

Table of Contents