Connecting The I/O Modules; Enclosures - R&S SpycerNode 2U12 User Manual

Table of Contents

Advertisement

Installation

Connecting the I/O Modules

Connecting the I/O Modules
2U Enclosures
Perform the following steps:
1.
Connect both AP-LS I/O modules with the control cable.
2.
If a JBOD I/O module is part of your system structure (see also JBOD I/O
Module (page 30)), connect the Mini SAS HD connectors from the AP-
LS I/O module to the JBOD I/O modules as described below.
The SpycerNode modules are now properly installed.
48
For systems with a single JBOD module::
1
For systems with two JBOD modules:
2 1
1
1 1 1 2
1
JBOD _1
JBOD _2
User Manual | 2902.3266.02 - 08
SpycerNode
JBOD

Advertisement

Table of Contents
loading

Table of Contents