Figure 37: Positioning The Sfp Handle In The Upright Position; Figure 38: Connecting A Fiber Optic Cable To A Transceiver - Allied Telesis AT-IE510-28GSX Installation Manual

Industrial ethernet switch
Table of Contents

Advertisement

Figure 37. Positioning the SFP Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver, as shown in Figure 38.
The connector on the cable should fit snugly into the port, and the tab
should lock the connector into place.
Figure 38. Connecting a Fiber Optic Cable to a Transceiver
8. Repeat this procedure to install additional transceivers.
Once all transceivers are installed the switch is ready for use.
SFP Handle
AT-IE510-28GSX Installation Guide
77

Advertisement

Table of Contents
loading

Table of Contents