Installing Sfp And Sfp+ Modules; Figure 34: Removing The Dust Plug From A Transceiver Slot - Allied Telesis AT-IE510-28GSX Installation Manual

Industrial ethernet switch
Table of Contents

Advertisement

Installing SFP and SFP+ Modules

To install SFP and SFP+ transceivers, perform the following procedure:
1. Remove the dust plug from a transceiver slot on the switch. Refer to
Figure 34.
Figure 34. Removing the Dust Plug from a Transceiver Slot
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the transceiver
with the Allied Telesis label facing up. If you are installing the
transceiver in a bottom slot, position the transceiver with the label
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 35.
AT-IE510-28GSX Installation Guide
75

Advertisement

Table of Contents
loading

Table of Contents