6.12 Finishing Test Operation

To finish test operation, execute the "execution file reset" function described in Para
6.8. However, as you can guide the robot even when the execution file has already
been selected, you do not particularly need to reset the file.
You can also finish test operation in operation mode other than "TEACHING" by
means of the MODE select switch on the control panel.