Setting Down An Attachment - Wacker Neuson ET16 Operator's Manual

Track excavator
Table of Contents

Advertisement

5 Operation
Fig. 148
E
Fig. 149
A
B
Fig. 150
5-28

Setting down an attachment

1. Screw in the attachment and position it at 5 – 10 cm (2 – 4 in) above
the ground.
2. Shut off the engine and store the ignition switch key safely.
3. Turn the socket wrench D counter-clockwise until the bolts E are
completely retracted.
➥ The quick coupler system is unlocked.
4. Remove the socket wrench.
5. Start the engine.
6. Lower the attachment to level and firm ground ensuring stability.
D
7. Retract the bucket cylinder and quick coupler system A from the
attachment bolt B.
BA ET16 de* 1.0 * et16b510.fm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Et09-02

Table of Contents