Fig. 158
Fig. 159
Fig. 160
BA ET16 de* 1.0 * et16b510.fm
9. Before starting any work and after every locking process, press the
attachment to the ground and quickly move it back and forth over just
over the ground a few times to check the secure locking.
➥ The attachment may not detach from the quick coupler system in the
process.
Operation 5
5-33