Wacker Neuson ET16 Operator's Manual page 188

Track excavator
Table of Contents

Advertisement

7 Maintenance
7-20
Assembly
Perform the disassembly procedure in the reverse chronological order.
Tighten screws with the following torques:
Screws
C (M12/10.9)
F (M12/10.9)
G (M12/10.9)
Torque
Nm (ft.lbs)
110 (81)
BA ET16 de* 1.0 * et16w700.fm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Et09-02

Table of Contents