Releasing The Pressure In The Work Hydraulics; Re-Equipping - Wacker Neuson ET16 Operator's Manual

Track excavator
Table of Contents

Advertisement

Releasing the pressure in the work hydraulics

Re-equipping

B
Fig. 173
BA ET16 de* 1.0 * et16b510.fm
1. Stop the machine on firm, level, and horizontal ground.
2. Lower the attachment completely to the ground.
3. Lower the stabilizer blade to the ground.
4. Stop the engine.
5. Turn the starting key to position 1.
6. Move the control lever or the slide switch of the proportional controls of
the relevant hydraulic circuit in all directions repeatedly.
➥ The pressure in the corresponding system sections is released.
This can be seen by the brief movement the hoses make as the
pressure is released.
➥ Uncouple the attachment immediately after the pressure has been
released, otherwise pressure can be created again.
Removing
1. Lower the bucket to level ground with the flat side facing downward.
C
2. Stop and park the machine. Stop the engine. See "Preparing
lubrication".
3. Remove linch pins A.
4. First remove pin B, and then pin C. Carefully expel pins that are stuck
with a hammer and a brass punch.
A
If pin C is stuck:
1. Start the engine.
2. Slighty raise and lower the boom to take the load off the pin.
3. Stop and park the machine. Stop the engine. See "Preparing
lubrication".
4. Raise the control lever base.
5. Remove the starting key and carry it with you.
Information
Place the bucket only with minimum pressure on the ground as you
remove the pins. The higher the pressure on the ground, the higher the
resistance and the more difficult it is to remove the pins.
Operation 5
5-43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Et09-02

Table of Contents