Putting into operation for the first time and running-in period
BA ET16 de* 1.0 * et16i400.fm
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
•
Check the fluid levels according to chapter "Maintenance".
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
•
Do not load a cold engine.
•
Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
•
Do not change engine speed abruptly.
•
Avoid using the machine under heavy loads or at high speeds.
•
Avoid abrupt acceleration, braking and changing travel direction.
•
Do not run the engine at high speed for extended periods.
•
Observe the maintenance plans
sicht" on page
7-4.
Putting into operation 4
– see chapter "7.2 Wartungsüber-
4-33