Putting Into Operation For The First Time And Running-In Period - Wacker Neuson ET16 Operator's Manual

Track excavator
Table of Contents

Advertisement

Putting into operation for the first time and running-in period

BA ET16 de* 1.0 * et16i400.fm
Before putting the machine into operation for the first time, check whether
the equipment supplied with the machine is complete.
Check the fluid levels according to chapter "Maintenance".
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
Do not load a cold engine.
Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
Do not change engine speed abruptly.
Avoid using the machine under heavy loads or at high speeds.
Avoid abrupt acceleration, braking and changing travel direction.
Do not run the engine at high speed for extended periods.
Observe the maintenance plans
sicht" on page
7-4.
Putting into operation 4
– see chapter "7.2 Wartungsüber-
4-33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Et09-02

Table of Contents