Section 6: Operation
6.6 Power down device
Figure 70 Power down device
Figure 71 Position measurement vessel
Figure 72 Device with protective sleeve
Personnel: User
Safety gear:
• Disposable lab gloves
1. Power down device using on/off switch on rear side and disconnect power
plug.
2. Position a measurement vessel (1) on the thermistor probe.
NOTE!
The measurement vessel is securely attached to the thermistor probe
when it clicks into place.
3. Disinfect device if powered down for an extended period of time. Wipe
device using a wipe moistened with disinfectant.
4. Pull protective sleeve included with the delivery over the device.
64