Western Digital Ultrastar Data60 User Manual page 246

Hide thumbs Also See for Ultrastar Data60:
Table of Contents

Advertisement

User Guide
Figure 223: Open Baskets
d. Connect all of the SAS cables that will be used and route them through the baskets one at a
time. Make sure to follow the labels to make sure they are connected to the proper port.
e. If the installation includes more than 10 total cables, follow the recommendations in
Considerations for Cable Routing (page
Note: Each cable must be given enough slack at the connector end to
operate smoothly. For the lower CMA allow 20" - 21" (508 – 533.4mm)
between the connector and the first basket.
154). Read this section before proceeding.
4. Management
4.9 Daisy Chaining
Special
234

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

H4060-j

Table of Contents