Optional Internal Usb Card; Removing The Internal Usb Card - Dell EMC PowerEdge R7525 Installation And Service Manual

Hide thumbs Also See for PowerEdge R7525:
Table of Contents

Advertisement

Figure 127. Removing the system battery
Next steps
1.
Install the expansion card
2. If applicable, connect the cables to one or more expansion cards.
3. Follow the procedure listed in
4. Confirm that the battery is operating properly, by performing the following steps:
a. Enter the System Setup, while booting, by pressing F2.
b. Enter the correct time and date in the System Setup Time and Date fields.
c. Exit the System Setup.
d. To test the newly installed battery, remove the system from the enclosure for at least an hour.
e. Reinstall the system into the enclosure after an hour.
f. Enter the System Setup and if the time and date are still incorrect, see Getting help section.

Optional internal USB card

NOTE:
To locate the internal USB port on the system board, see the

Removing the internal USB card

Prerequisites
CAUTION:
To avoid interference with other components in the server, the maximum permissible dimensions of
the USB memory key are 15.9 mm wide x 57.15 mm long x 7.9 mm high.
1. Follow the safety guidelines listed in the
2. Follow the procedure listed in the
3.
Remove the expansion card
Steps
1. Holding the blue tag, lift the internal USB card to disconnect from the connector on the system board.
2. Remove the USB memory key from the internal USB card.
144
Installing and removing system components
risers.
After working inside your system
Safety instructions
Before working inside your system
risers.
on page 27.
System board jumpers and connectors
on page 26.
on page 27.
section.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E68s

Table of Contents