Figure 78. Closing the rail frame
3. Secure the force plate to the processor socket base by tightening the screws in the sequence 1, 2, and 3. When all three
screws are fully threaded, the socket is then actuated. The three screws are tightened to a torque value of 12.0 ± 1.2 lbf-in.
NOTE:
The screw numbers are marked on the force plate.
NOTE:
Press the force plate while tightening the screws to avoid tilting of the processor cover out of the processor
socket.
Figure 79. Securing the force plate
Installing and removing system components