Check List Before Starting A Measurement - kruss K11 MK3 User Manual

Tensiometer
Table of Contents

Advertisement

page 38
6.5

Check list before starting a measurement

The following preparations should have been made before a measurement is started:
A warming-up period of 2 hours must be observed directly after the instrument is
switched on.
Take care that you have selected the correct main menu (
for the intended method. Also check that the correct measuring method has been
selected (
must also select between
Make sure that the parameters in the main menu and setup are suitable for the
measurement.
The probe (plate, ring or density probe) must been cleaned and attached to the
probe holder.
The probe and the liquid must no longer move about. The doors of the measuring
chamber must be closed.
The liquid must have reached the required temperature for the measurement.
If data are to be transferred the computer must be connected and the data logger
add-in of the LabDesk software loaded. The button
be pressed. Otherwise the measurement will be carried out without you having any
possibility of storing the data.
If data are to be transferred to a protocol printer the printer must be connected and
operational.
SFT
IFT
or
). For surface tension measurements with the ring method you
Push
Pull
and
.
Preparing a measurement
Plate
Ring
Density
,
or
in the symbol bar must
)

Advertisement

Table of Contents
loading

Table of Contents