SCC-U UTILITY UNIT | OI/SCC-U-EN REV. B

5 Installation

Requirements for the installation site

Installation location
The environmental conditions should be observed (see Ambient
conditions).
The device should be installed near the gas analyzer and the
other connected devices.
The length of the delivered power supply cables is 2 meters.
Adequate air circulation
Ensure adequate natural air circulation around the device.
Avoid heat buildup.
Protection against adverse environmental conditions
The utility unit should be protected from:
Cold
Radiated heat, e.g. from the sun, kilns or boilers
Temperature fluctuations
Strong air movement
Dust deposits and dust penetration
Corrosive atmosphere
Vibration

Ambient conditions

Ambient temperature
Operation: 10 to 40 °C
Storage and transport: −25 to 60 °C
Relative humidity
≤ 75 % annual average
Installation location
Indoors only
Installation in general purpose environment only.

Construction

Design
19 in housing (3 height units)

Mounting

Rack mounting on mounting rails.
The gas and electrical con-nections are located on the rear
side of the housing.
Consider the distances from the wall during installation:
Left- and right-hand side panels at least 35 mm,
Rear panel at least 200 mm.
A distance of at least 1 height unit from devices which
develop heat is required.
Housing material and color
Aluminum, front panel light gray (RAL 7035)
IP protection of housing
IP 20 according to EN 60529
Dimensions
See Dimensions on page 22.
Weight
Approx. 10 kg
Mounting

Installation in a 19 in cabinet / rack

1. If necessary, install mounting rails in the cabinet / rack.
2. Mount the utility unit in a 19 in cabinet / rack using 4 × M6
screws (not supplied).