5.2.30Light Dump
Replacement Time: 20 minutes
Procedure:
1. Remove Top Cover. See
2. Remove Top Shield. See
3. Remove screws (2). See Figure 5-50.
4. Lift Light Dump out from projector.
5. Replace Light Dump.
5.2.31Contact Board FLC
Replacement Time: 10 minutes
Procedure:
1. Remove Lens Assembly. See
2. Disconnect harness. See Figure 5-51.
3. Remove screws (2).
4. Replace Contact Board FLC.
5.2.32Dynamic Aperture
Replacement Time: 30 minutes
Procedure:
1. Remove Top Cover. See
2. Remove Top Shield. See
3. Remove Prism Fan Assembly. See
4. Disconnect harnesses from DA Board and Connector-A Board.
E Series 675/775 Service Manual
020-000546-04 Rev. 1 (04-2017)
5.2.5 Top
Cover.
5.2.7 Top
Shield.
F
5-50 R
IGURE
EMOVE
5.2.3 Lens
Assembly.
5.2.5 Top
Cover.
5.2.7 Top
Shield.
5.2.12 Prism Fan
Section 5: Parts and Module Replacement
L
D
IGHT
UMP
F
5-51 R
IGURE
EMOVE
Assembly.
C
B
FLC
ONTACT
OARD
5-29