Connector-A Board; Procedure; Interlock Switch; Lamp 1 Driver Board - Christie E Series Service Manual

Hide thumbs Also See for E Series:
Table of Contents

Advertisement

8. Pinch stand-offs (4) to release Lamp 1 Driver Board from bracket. See Figure 5-33.
9. Replace Lamp 1 Driver Board.
5.2.21Lamp 2 Driver Board
Replacement Time: 25 minutes

Procedure:

1. Remove Top Cover. See
2. Remove Top Shield. See
3. Disconnect all harness from Connector-A Board. See
4. Disconnect Interlock harness. See
5. Remove screws (5). See Figure 5-34.
6. Pull up Power Supply Cover assembly to expose harness underneath.
E Series 675/775 Service Manual
020-000546-04 Rev. 1 (04-2017)
F
5-33 R
L
IGURE
EMOVE
5.2.5 Top
Cover.
5.2.7 Top
Shield.
5.2.19 Interlock
F
5-34 R
P
IGURE
EMOVE
Section 5: Parts and Module Replacement
1 D
B
AMP
RIVER
OARD
5.2.18 Connector-A
Switch.
S
C
OWER
UPPLY
OVER
Board.
5-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dwu675-eDhd675-eDwu775-eDhd775-e

Table of Contents