Top Shield; Procedure; Color Wheel; Cooling Fan - Lamp 1 - Christie E Series Service Manual

Hide thumbs Also See for E Series:
Table of Contents

Advertisement

5.2.7 Top Shield

Replacement Time: 15 minutes

Procedure:

1. Remove Top Cover. See
2. Remove screws (16) and lift shield from projector chassis. See Figure 5-7.

5.2.8 Color Wheel

Replacement Time: 5 minutes
Procedure:
1. Loosen captive screws (2) and lift lamp access cover. See center of Figure 5-3.
2. Loosen captive screws (2) and remove Color Wheel. See Figure 5-4.
3. Replace Color Wheel. NOTE: System will detect (via software) type of color wheel when installed.
4. Perform the procedure in

5.2.9 Cooling Fan - Lamp 1

Replacement Time: 25 minutes
Procedure:
1. Remove Top Cover. See
2. Remove Top Shield. See
3. Disconnect harness (Fan 7) from Connector-B Board.
4. Remove harness cable from retaining clips.
5. Remove screws (2). See Figure 5-8.
E Series 675/775 Service Manual
020-000546-04 Rev. 1 (04-2017)
5.2.5 Top
Cover.
F
5-7 T
IGURE
OP
3.6.3 Color Wheel Index
5.2.5 Top
Cover.
5.2.7 Top
Shield.
Section 5: Parts and Module Replacement
S
HIELD
Adjustment.
5-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dwu675-eDhd675-eDwu775-eDhd775-e

Table of Contents