Download Print this page

Siemens 3RW51 Series Manual page 67

Industrial controls , soft starters and solid-state switching devices

Advertisement

4.9
Installing the cover for the control cable duct (optional accessory)
Requirements
● 1-2 cable ties
● Cover for control cable channel (accessory part: 3RW5950-0GD20)
Procedure
● Lay the control cables in the control cable duct and fix the control cables in place with
cable ties.
● Press the cover for the control cable duct into the openings
engages
3RW51 Soft Starter
Manual, 06/2019, A5E37108631002A/RS-AB/002
4.9 Installing the cover for the control cable duct (optional accessory)
.
provided until it audibly
Wiring
67

Advertisement

loading