3. Commissioning
3.3
Preparing the CTEL system for commissioning
3.3.1 Check the connected I-port devices
Festo P.BE-CPX-CTEL-EN en 1205NH
Note
Do not yet connect the CPX terminal to a higher-order con-
troller yet to prepare for commissioning.
You will thus avoid addressing errors which may occur in
various fieldbus systems when address ranges are modi-
fied during operation.
Please observe that host system integration of the CTEL mas-
ter module might have to take place through a device
description file, dependent on the CPX fieldbus node used.
You can find the corresponding description files at
www.festo.com.
Check, if necessary, the position of the DIL switches to
•
guarantee the desired operating mode and configuration
presetting.
Check the CTEL master module for a tight fit in the inter-
•
linking block.
Check whether the connected devices correspond to the
•
entry of the configuration file on the host system (see
section 2.6).
Check whether the connected I-port devices are distrib-
•
uted corresponding to their priority for the diagnostic/er-
ror messages at the I-ports (see section 4.2.1).
Check whether the current consumption of the connected
•
I-port device and the other CPX modules corresponds to
the specifications and limits (see section 2.5).
Check the power supply connections at the interlinking
•
blocks.
3-13