3. Commissioning
3.4
Preparing for commissioning
Festo P.BE-CPX-F8DE-P-E N en 1610a English
1. Ensure that the CPX terminal is mounted correctly è CPX
system description.
2. Check the wiring (connection cables,contact allocation)
è Chapter 2.2.1.
3. Dismantle the connection block on the input module
è Chapter 2.3.1.
4. Check that the input module functions perfectly.
5. Set the PROFIsafe address on the input module using the
DIL switch and install the connection block
è Chapter 2.3.2.
3-5