Waters ACQUITY UPLC Overview And Maintenance Manual page 81

Sample manager flow through needle
Table of Contents

Advertisement

Figure 3–27: Inject/wash station assembly
2
Inject/wash station assembly
Screw
30. Ensure that all cables are routed so that they do not interfere with the operation of the
needle-carriage home sensor for the needle carriage.
Figure 3–28: Needle-carriage home sensor
Needle-carriage home sensor
31. Using gentle radius bends, route the seal-port tube up the right-side edge of the sample
compartment, exiting behind the sample-needle tubing and to the right.
Requirement:
Ensure that the cable emerges from the injection-port assembly without
any tight bends.
Notice:
To avoid errors in operation, ensure that the load-cell cable is routed
behind the seal-port tube and the wash tubing.
1
1
June 11, 2019, 715005051 Rev. D
Page 81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents