Waters ACQUITY UPLC Overview And Maintenance Manual page 77

Sample manager flow through needle
Table of Contents

Advertisement

Seal-port tube
Step in locking nut
21. Slide the seal-port tube into the slot on the side of the housing.
Figure 3–20: Sliding seal-port tube into slot
8
7
6
5
Support sleeve
Seal-port tube
Slot
Spring cup
Load-cell cable
Spring
Housing
Locking nut
Requirement:
Ensure that the three prongs on the locking nut are seated inside the
spring.
1
2
3
4
June 11, 2019, 715005051 Rev. D
Page 77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents