Drainage System Requirements; Installing The Waste Tubing - Waters ACQUITY UPLC Overview And Maintenance Manual

Sample manager flow through needle
Table of Contents

Advertisement

Alignment pins
Alignment slots
2.
Lower the front of the module that you are adding so that its front alignment pin rests in the
front alignment slot on the previously added module.
3.
Repeat steps 1 and 2 for the remaining system modules.

2.5 Drainage system requirements

When plumbing the sample manager, observe these drainage system requirements:
• Ensure that the sample manager can accept drainage from the column heater, and provide a
path to the waste vessel.
• Route drainage tubing and fluid lines through the tubing guide on the right-hand side of the
sample manager.

2.6 Installing the waste tubing

Warning:
To avoid personal contamination with biologically hazardous or toxic compounds,
wear clean, chemical-resistant, powder-free gloves when performing this procedure.
Warning:
Required tools and materials
• Chemical-resistant, powder-free gloves
• Protective eyewear
To install the waste tubing:
1.
Locate the preinstalled corrugated tubing that runs from the process waste port (found on
the lower drip tray of the sample manager) and route it through the pass-through on the
upper drip tray of the solvent manager.
To avoid eye injury, use eye protection when performing this procedure.
June 11, 2019, 715005051 Rev. D
Page 28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents