Waters ACQUITY UPLC Overview And Maintenance Manual page 70

Sample manager flow through needle
Table of Contents

Advertisement

Figure 3–7: Inject/wash station assembly
2
Inject/wash station assembly
Screw
Note:
To ensure proper reinstallation of the inject/wash station assembly, note the
location and routing of the wash tubing, seal-port tube, and load-cell cable before removing
it.
Figure 3–8: Tubing and cable locations
Wash tubing
Seal-port tube
Load-cell cable
1
1
2
3
June 11, 2019, 715005051 Rev. D
Page 70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents