Waters ACQUITY UPLC Overview And Maintenance Manual page 78

Sample manager flow through needle
Table of Contents

Advertisement

Figure 3–21: Prongs seated inside spring
1
Prong (3)
Locking nut
Spring
22. Slide the support sleeve into the housing, ensuring that the fitting hole on the support
sleeve aligns with the slot on the housing.
Figure 3–22: Support sleeve in housing
1
Fitting hole
Slot
Notice:
To avoid damaging the support sleeve, be careful not to cross-thread or
overtighten the adapter fitting.
23. Reattach the adapter fitting to the support sleeve and tighten the fitting to the extent
possible using only your fingers.
2
3
2
June 11, 2019, 715005051 Rev. D
Page 78

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents