7.10.8
Empty signal
Under the menu item "Empty signal" you can select whether an open or closed contact
leads to an empty signal and whether a container change at the pump must be manually
released or not.
A suitable suction pipe must be connected to the empty signal input on the
pump on terminals 25, 26 and 27
(suction lance)' on page 62 .
The following should be noted here:
– Connect zero-potential contact to pulse input and GND.
– Do not connect any external voltages!
– Minimum switch-on and switch-off times = 15 ms.
Fig. 55: Configuration: Empty signal acknowledgement
Factory setting: Auto acknowledge (acknowledge automatically)
Selection of the [configuration] - [Empty signal]:
1.
[Call up the Main menu] :
2.
[Configuration] - setting:
3.
Use the scrollbar to scroll to the [Empty signal] .
4.
[Select Empty signal] .
5.
If required, select 'Empty signal contact' : 'Closed contact = Empty signal' .
ð After selecting this, a check mark
6.
[Click Next]
ð Screen changes to the acknowledgement query of the 'empty signal' .
7.
Select the required option:
The following options can be selected:
Ä Chapter 7.10.8.1 'Acknowledge automatically: ' on page 104
n
Ä Chapter 7.10.8.2 'Acknowledge manually: ' on page 105
n
8.
Pressing the
ð The screen switches to the overview: [Configuration].
9.
By pressing the
10. By pressing the
3
5
4
Ä Chapter 7.7 'Main menu' on page 73
Ä Chapter 7.10 'Overview - Configuration' on page 92
to save the setting.
button saves the setting.
button, you can return to the [main menu].
button, you can return to the [operating display].
103
Ä Chapter 6.4.9 '[Level] Level monitoring
6
is set in the selection field.
417102276 Rev. 5-02.2020
Control / Software
8
7