Hose Connection With Plug Section And Clamping Section - Ecolab EcoAdd Series Operating Instructions Manual

Dynamic pump
Table of Contents

Advertisement

Available languages

Available languages

Mounting and installation

6.3.2.2 Hose connection with plug section and clamping section

1
2
3
4
5
6
Fig. 12: Pipe/hose connection with tapered part
1
Hose
2
Swivel nut
3
Clamp
4
Cone
1.
Cut hose (Pos. 1) straight.
2.
Push the swivel nut (pos. 2) over the hose (pos. 1).
3.
Push the clamping piece (pos. 3) over the hose (pos. 1).
4.
Push the hose (pos. 1) onto the tapered part (pos. 4) up to the stop collar (detail A1).
5.
Push the clamping piece (pos. 3) in the direction of the tapered part (pos. 4) until
resistance is noticeable.
6.
Place an O-ring (pos. 5) in the groove of the suction or pressure valve (pos. 6).
7.
Tighten the union nut (2) (detail B1).
417102276 Rev. 5-02.2020
A1
B1
52
5
O-Ring
6
Suction valve, pressure valve
A1 Pipe or Hose plugged on
B1 Valve connection: Target state after assembly

Advertisement

Table of Contents
loading

Table of Contents