Pump Head Variants - Ecolab EcoAdd Series Operating Instructions Manual

Dynamic pump
Table of Contents

Advertisement

Available languages

Available languages

5.3

Pump head variants

The litre capacity of the pump is defined depending on the design of the
pump head and of the metering valves.
The connection variants are available in
the suction and pressure lines (metering lines)' on page 51 and
maintenance in
Ä Chapter 12 'Wearing parts and spare parts' on page 168 be taken out.
NOTICE!
Tightening torques of the metering head screws are given on an adhesive
label on the corresponding metering head and must always be observed.
CAUTION!
Following initial commissioning and all maintenance work on the metering
head, the screws should be tightened diagonally after 24 hours according
to the specifications to ensure the leak-tightness of the system. The
maintenance intervals must also be observed.
Fig. 6: Pump head variants
Ä Chapter 11 'Servicing' on page 156 . Spare parts can
41
Description of the pump
Ä Chapter 6.3.2 'Connection of
417102276 Rev. 5-02.2020

Advertisement

Table of Contents
loading

Table of Contents