Installing With Adjustable Guide Rails - Huawei TaiShan 200 2280 Maintenance And Service Manual

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
3.
Step 4 Connect power cables to the server and power on the server. Connect a network
cable, a VGA cable, or USB devices as required.
----End

5.4.3.2 Installing with Adjustable Guide Rails

Adjustable guide rails are for a cabinet with a depth of 543.5 mm to 848.5 mm
(21.40 in. to 33.41 in.) between the front and rear mounting bars.
The servers are stackable onto adjustable guide rails.
Step 1 Install the adjustable guide rails.
1.
Issue 04 (2020-01-16)
Figure 5-6 Installing the server
When the two mounting ears of the server come into contact with the
mounting bars on the cabinet, tighten their captive screws to secure the
server. See (2) in
Figure
Position a guide rail horizontally in contact with the mounting bars and hook
it onto the cabinet. See (1) in
The three holes in each mounting ear of a guide rail should be within 1U boundary
lines.
Copyright © Huawei Technologies Co., Ltd.
5-6.
Figure
5-7.
5 Removal and Installation
80

Advertisement

Table of Contents
loading

Table of Contents