Huawei TaiShan 200 2280 Maintenance And Service Manual page 164

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
Step 24 Lift the mainboard. See
Figure 5-99 Removing the mainboard
Step 25 Place the removed mainboard in an ESD bag.
----End
Installing the Mainboard
Step 1 Wear an ESD wrist strap. For details, see
Step 2 Take a spare mainboard out of its ESD bag.
Step 3 Put the mainboard in the chassis. See
Issue 04 (2020-01-16)
Figure
During the removal, avoid colliding with the plastic parts for wind blocking in the chassis.
Copyright © Huawei Technologies Co., Ltd.
5-99.
5.2 ESD
Protection.
Figure
5-100.
5 Removal and Installation
157

Advertisement

Table of Contents
loading

Table of Contents