TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
4.
Step 2 Install the L-shaped guide rails.
1.
2.
3.
Step 3 Install the server.
1.
2.
Issue 04 (2020-01-16)
Install a floating nut to the other front mounting bar in the same way.
Position a guide rail horizontally in contact with the mounting bars in the
cabinet.
Tighten the screws to secure the guide rail. See
Figure 5-5 Installing an L-shaped guide rail
Install the other guide rail in the same way.
Lift the server. This task requires at least two people.
Place the server on the guide rails and slide it into the cabinet. See (1) in
Figure
5-6.
Copyright © Huawei Technologies Co., Ltd.
5 Removal and Installation
Figure
5-5.
79