Huawei TaiShan 200 2280 Maintenance And Service Manual page 133

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
Installing the Screw-in RAID Controller Card
Step 1 Wear an ESD wrist strap. For details, see
Step 2 Power off the server. For details, see
Step 3 Remove the power cables. For details, see
Step 4 Remove the server. For details, see
Step 5 Remove the chassis cover. For details, see
Step 6 If I/O module 2 is configured with a full-height full-length riser module, remove
the riser module. For details, see
Step 7 If a supercapacitor is required, install it. For details, see
Step 8 Take a spare RAID controller card out of its ESD bag.
Step 9 Determine the position of the RAID controller card on the mainboard. See
5-63.
Figure 5-63 Position of the RAID controller card
Step 10 Align the connector on the RAID controller card with the port on the mainboard,
and insert the RAID controller card slowly into the mainboard. See (1) in
5-64.
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
5.2 ESD
Protection.
5.4.2 Powering Off the
5.7
PSU.
5.4.4 Removing the Server and Guide
5.8 Chassis
5.11 Riser
Module.
5 Removal and Installation
Server.
Cover.
5.15
Supercapacitor.
Figure
Rails.
Figure
126

Advertisement

Table of Contents
loading

Table of Contents