Installing With Adjustable Guide Rails - Huawei TaiShan 2280 V2 User Manual

Table of Contents

Advertisement

TaiShan 2280 V2 Server
User Guide
Step 4 Connect power cables to the server and power on the server. Connect a network cable, a VGA
cable, or USB devices as required.
----End

4.4.2 Installing with Adjustable Guide Rails

Adjustable guide rails are for a cabinet with a depth of 543.5 mm to 848.5 mm (21.40 in. to
33.41 in.) between the front and rear mounting bars.
The TaiShan 2280 V2 servers are stackable onto adjustable guide rails.
Step 1 Install the adjustable guide rails.
1.
2.
3.
4.
Step 2 Install the server.
Issue 01 (2019-07-01)
Position a guide rail horizontally in contact with the mounting bars and hook it onto the
cabinet. See (1) in
Figure
NOTE
The three holes in each mounting ear of a guide rail should be within 1U boundary lines.
Figure 4-6 Installing an adjustable guide rail
Plug the second square holes at the front and rear of the guide rail using the plugs
included to secure the guide rail. See (2) in
(Optional) Install an M6 screw in the square hole underneath at the rear of the guide rail
and secure it. See (3) in
NOTE
While screws are not necessary for the installation of adjustable guide rails, M6 screws at the rear
end of the server will make it more shockproof and secure.
Install the other guide rail in the same way.
Copyright © Huawei Technologies Co., Ltd.
4-6.
Figure
Figure
4-6.
4-6.
4 Setup
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents