Huawei TaiShan 200 2280 Maintenance And Service Manual page 163

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
Figure 5-97 Removing a cable organizer
Step 22 Use a Phillips screwdriver to loosen the captive screw on the mainboard. See (1) in
Figure
Figure 5-98 Removing the mainboard
Step 23 Holding the mainboard handles in the red circles, push the mainboard in the
arrow direction as far as it will go. See (2) in
Do not hold any other protruding part on the mainboard to lift it. Otherwise, the
components on the mainboard may be damaged.
Issue 04 (2020-01-16)
5-98.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
5 Removal and Installation
Figure
5-98.
156

Advertisement

Table of Contents
loading

Table of Contents