Huawei TaiShan 200 2280 Maintenance And Service Manual page 107

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
Figure 5-31 Installing a PSU
Step 5 Connect the cables to the PSUs.
1.
2.
Figure 5-32 Connecting cables
Step 6 Log in to the iBMC WebUI, and check whether the new component is normal. For
details, see the
----End
Issue 04 (2020-01-16)
Put the OT terminal (for the ground cable) on the screw removed from the
ground hole, install the screw on the ground hole, and tighten the screw. See
(1) in
Figure
5-32.
Insert the power cables to the wiring terminals on the PSU until the cables
click into position. See (2) in
Connect the cord end terminal of the negative power cable (blue) to the
NEG(-) wiring terminal on the PSU.
Connect the cord end terminal of the positive power cable (black) to the
RTN(+) wiring terminal on the PSU.
TaiShan Rack Server iBMC User Guide
Copyright © Huawei Technologies Co., Ltd.
Figure
5-32.
5 Removal and Installation
.