Huawei TaiShan 200 2280 Maintenance And Service Manual page 112

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
Installing the Air Duct
Step 1 Wear an ESD wrist strap. For details, see
Step 2 Power off the server. For details, see
Step 3 Remove the power cables. For details, see
Step 4 Remove the server. For details, see
Step 5 Remove the chassis cover. For details, see
Step 6 (Optional) If a full-height full-length riser module is installed in I/O module 1 or
2, remove it. For details, see
Step 7 Take a spare air duct out of its ESD bag.
Step 8 Align the positioning pins on the air duct with the fixing holes on the chassis
according to the instructions on the air duct. Vertically place the air duct
downwards. See
Figure 5-37 Installing the air duct
Step 9 If a supercapacitor is required, connect the cable between the supercapacitor and
RAID controller card. See
Issue 04 (2020-01-16)
5.11 Riser
Figure
5-37.
Figure
Copyright © Huawei Technologies Co., Ltd.
5.2 ESD
Protection.
5.4.2 Powering Off the
5.7
PSU.
5.4.4 Removing the Server and Guide
5.8 Chassis
Module.
5-38.
5 Removal and Installation
Server.
Cover.
Rails.
105

Advertisement

Table of Contents
loading

Table of Contents