Huawei TaiShan 200 2280 Maintenance And Service Manual page 88

Hide thumbs Also See for TaiShan 200 2280:
Table of Contents

Advertisement

TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
2.
3.
4.
Step 2 Install the server.
1.
2.
Issue 04 (2020-01-16)
Figure 5-7 Installing an adjustable guide rail
Plug the second square holes at the front and rear of the guide rail using the
plugs included to secure the guide rail. See (2) in
(Optional) Install an M6 screw in the square hole underneath at the rear of
the guide rail and secure it. See (3) in
While screws are not necessary for the installation of adjustable guide rails, M6 screws
at the rear end of the server will make it more shockproof and secure.
Install the other guide rail in the same way.
Lift the server. This task requires at least two people.
Place the server on the guide rails and slide it into the cabinet. See (1) in
Figure
5-8.
Copyright © Huawei Technologies Co., Ltd.
5 Removal and Installation
Figure
5-7.
Figure
5-7.
81

Advertisement

Table of Contents
loading

Table of Contents