Installing The Switch - Allied Telesis x950 Series Installation Manual

Stand-alone switches
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Installing the Switch

Please review the information and perform the procedures in Chapter 3,
"Beginning the Installation" on page 59 before installing the switch.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.  E28
Note
The switch can be installed in an equipment rack with the RKMT-
SL01 Sliding Rack Mount Kit. For instructions, refer to the RKMT-
SL01 Sliding Rack Mount Kit Installation Guide.
Note
The switch comes with four brackets. Installing the device in an
equipment rack requires only two brackets. All four brackets are
used when installing the switch on a wall.
To install the switch in a 19-inch equipment rack, perform the following
procedure:
1. Place the unit on a level, secure surface.
2. If you have not chosen an orientation for the switch in the equipment
rack, review "Switch Orientations in the Equipment Rack" on page 92.
3. Attach two of the four rack mount brackets to the sides of the switch in
the selected positions, with eight of the M4x6mm screws included with
the unit. The illustration in Figure 48 on page 96 shows the installation
of the brackets so that the front panel is even with the front of the
equipment rack.
x950 Series Installation Guide for Stand-alone Switches
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqm

Table of Contents