Chapter 6: Installing The Switch In An Equipment Rack - Allied Telesis x950 Series Installation Manual

Stand-alone switches
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 6
Installing the Switch in an Equipment
Rack
This chapter contains instructions for installing the switch in a standard 19-
inch equipment rack. The procedures are listed here:
"Beginning the Installation" on page 92
"Removing the Bumper Feet" on page 94
"Installing the Switch" on page 95
91

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqm

Table of Contents