Figure 57: Marking The Locations Of The Bracket Holes On A Concrete Wall - Allied Telesis x950 Series Installation Manual

Stand-alone switches
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 7: Installing the Switch on a Wall
112
Figure 57. Marking the Locations of the Bracket Holes on a Concrete Wall
4. Place the switch on a table or desk.
5. Use a drill and 1/4" carbide drill bit to pre-drill the four holes you
marked in step 3. Please review the following guidelines:
Prior to drilling, set the drill to hammer and rotation mode. The
modes break up the concrete and clean out the hole.
Allied Telesis recommends cleaning out the holes with a brush or
compressed air.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqm

Table of Contents