Testing The Tube Voltage (Tube Assembly 2.0) - Sirona Orthophos XG 3D/Ceph Installation Manual

Table of Contents

Advertisement

Sirona Dental Systems GmbH
Installation Manual ORTHOPHOS XG 3D / Ceph
Preparing the measurement
A
Performing measurements
Analyzing measurements
Concluding the measurement
63 03 452 D3352
D3352.031.05.08.02 10.2015
12.5

Testing the tube voltage (tube assembly 2.0)

1. Attach the Mult-O-Meter sensor in the middle of the combisensor (on
2D sensor side).
2. Set the main switch (A) to I (see also Operating Instructions).
3. Wait for approx. 1 minute.
4. Press the R key.
 The unit moves to its starting position.
1. Select the P1 program (see Operating Instructions).
2. Set the kV/mA level 62 kV/8 mA (see Operating Instructions).
3. Make ready for exposure in SIDEXIS (see Operating Instructions).
4. CAUTION! Activating the release button triggers X-rays.
Start the exposure by pressing the release button. Hold down the
release button until image acquisition is completed and the acoustic
signal that indicates the end of the exposure can be heard.
➢ Read the voltage values on the display of the Mult-O-Meter.
IMPORTANT
The measured tube voltage must correspond with the tube voltage set
of 62kV. The permissible tolerance is ± 10 %.
 If the measured values
range
, replace the
 If the measured values are within the permissible tolerance
range, finalize the measurement.
➢ Switch the unit on via switch (A) (see also Operating Instructions).
12 Startup, measurements and tests (for USA/Canada only)
12.5 Testing the tube voltage (tube assembly 2.0)
do not fall within the permissible tolerance
tube assembly
(see Service Manual).
183

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents