Otto Bock Genium 3B1-2 Instructions For Use Manual page 97

Hide thumbs Also See for Genium 3B1-2:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 51
Beep
Vibration
signal
signal
3x short
3x short
5x long
5x long
(every
minute)
Battery charge level
During the charging process, the current battery charge level is indicated by the LEDs lit on the
side of the charger.
LEDs
0
Battery
0%-10%
charge level
Event
Maintenance note:
e.g. service interval has been
exceeded, temporary disruption of a
sensor signal
Self-test error
1
2
11%-30%
31%-50%
Resolution
Use the Cockpit app/remote
control to check the next main­
tenance date for the prosthesis
(see Page 80). Should the date
lie within the next month,
arrange
appointment with the prosthet­
ist. For this appointment, the
prosthetist has to be provided
with the battery charger, power
supply and remote control (if
included) in addition to the
prosthesis.
Conduct the self-test again by
connecting/disconnecting
battery charger.
If the beep signal sounds again
and the maintenance date has
not
yet
exceeded, visit the prosthetist
soon. If necessary, the pros­
thetist will forward the pros­
thesis
to
Ottobock Service Centre.
The product can be used
without restrictions. However,
vibration signals may not be
generated.
Conduct the self-test again by
connecting/disconnecting
battery charger.
If the beep/vibration signal
occurs again, visit your pros­
thetist promptly. If necessary,
the prosthetist will forward the
prosthesis to an authorised
Ottobock Service Centre.
3
4
51%-70%
71%-90%
a
maintenance
the
been
reached
or
an
authorised
the
5
>90%
97

Advertisement

Table of Contents
loading

This manual is also suitable for:

Genium 3b1-2-st

Table of Contents