Running A 3G-Sdi Port Performance Test; Running A 3D Sync Out Port Performance Test - Christie GS Series Service Manual

Hide thumbs Also See for GS Series:
Table of Contents

Advertisement

Running a 3G-SDI port performance test

ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the 3G-SDI port performance test, complete the following steps.
1. Connect the projector and DVD player using a toaxil cable.
2. Select the signal source 3G-SDI.
The image of DVD player generator is projected.

Running a 3D SYNC out port performance test

ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the 3D SYNC out port performance test, complete the following steps.
1. Connect the projector and RF emitter using a BNC cable.
2. Wear the 3D RF glasses.
3. Select the signal source 3D SYNC.
The 3D image is projected.
GS Series 700-850 Service Manual
020-001054-02 Rev. 1 (04-2017)
Description
DVD player
720p, 1080p, 1080i
3G-SDI port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Description
3D RF glasses, RF emitter
1080p@60Hz
3D SYNC out port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Service setups
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dwu700-gsDhd850-gsDwu850-gsDhd700-gs

Table of Contents