I/O Port Function Test; Running A Vga Port Performance Test; Running A Hdmi Port Performance Test - Christie GS Series Service Manual

Hide thumbs Also See for GS Series:
Table of Contents

Advertisement

I/O port function test

Always perform the I/O port function test after repairing the main board, the light engine, or
upgrading the scalar firmware. If performance is not normal, replace the main board or I/O board
(see
Replacing the main board and I/O board

Running a VGA port performance test

ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the VGA port performance test, complete the following steps.
1. Connect the projector and video generator using a VGA cable.
2. Select the signal source VGA.
The image of video generator is projected.

Running a HDMI port performance test

ID
Part name
1
Test equipment
2
Test signal
3
Inspection item
4
Inspection distance
5
Criteria
To perform the HDMI port performance test, complete the following steps.
1. Connect the projector and DVD player using a HDMI cable.
2. Select the signal source HDMI.
The image of DVD player is projected.
GS Series 630-635 Service Manual
020-001224-02 Rev. 1 (08-2018)
on page 69).
Description
Video generator
1920 x 1200 @60Hz General-1
VGA port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Description
DVD player with HDMI output set to 16:9
480p, 720p, 1080p
HDMI port performance test
1.8 to 2.2 m
No abnormal color performance, line distortion, or noise exist on the screen
Service setups
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dwu635-gsDhd635-gsDwu630-gsDhd630-gs

Table of Contents