Figure 8-54 Attaching The Ap(A)/Ap(R)-R Unit To The Dth/Dtr Multiline Terminal; Figure 8-55 Installing Ferrite Core - NEC ElectraElite 48 System Hardware Manual

Table of Contents

Advertisement

Electra Elite
System Hardware Manual
3.
Hook tabs A and B in the slots on the Multiline
Terminal as shown in
AP(A)/AP(R)-R Unit to the DTH/DTR Multiline
Terminal, and press down until the unit clicks into
place.
Figure 8-54 Attaching the AP(A)/AP(R)-R Unit to the DTH/
DTR Multiline Terminal
4.
Close the base plate, and snap the cover in place.
5.
Install the ferrite core (provided with either Unit)
about 2 inches from the line cord plug as shown in
Figure 8-55 Installing Ferrite
6.
Connect the line cord to the unit. Limit the cable
length from the AP(A)/AP(R)-R Unit to the Single
Line Telephone to a maximum of 50 feet.

Figure 8-55 Installing Ferrite Core

Issue 6
Figure 8-54 Attaching the
Core.
8 - 43

Advertisement

Table of Contents
loading

Table of Contents