Figure 7-35 Threading Screw Into Wall; Wall Mounting Dbm(B)-U( ) And Expansion Boards - NEC ElectraElite 48 System Hardware Manual

Table of Contents

Advertisement

Issue 6
7 - 28
5.
Ensure that the internal end of the cable is
connected to DBM(E) CN2.
The second expansion board must have this
cable connected internally to DBM(E) CN3
and externally to the first DBM(E) CN7. The
third, fourth, and fifth expansion board cables
are connected externally to the previous
DBM(E) CN7 and internally to CN4, CN5, and
CN6 respectively.
6.
After all expansion boards are connected, place the
white cover sheets back on the DBM(B)-U( ) and all
expansion boards, and install the display panels.
3.7.2

Wall Mounting DBM(B)-U( ) and Expansion Boards

1.
Refer to the template, and thread the included
screw into the wall at location for the top hole of the
DBM(B)-U( ) Box. Leave screw extended 1/8 inch.
Refer to

Figure 7-35 Threading Screw into Wall

2.
Place hole for mounting over the screw, and Hang
the DBM(B)-U( ) on the screw. Refer to
Hanging DBM(B)-U( ) on
Figure 7-35 Threading Screw into
Screw.
Installing Optional Equipment
Electra Elite
Wall.
Figure 7-36

Advertisement

Table of Contents
loading

Table of Contents