High-Pressure Pump And Ipr Valve; High-Pressure Oil Rail Assembly - Navistar INTERNATIONAL DT 466 Service Manual

Hide thumbs Also See for INTERNATIONAL DT 466:
Table of Contents

Advertisement

346
3. Loosen jam nuts on each elbow.
4. Remove 70 and 90 degree elbows.
5. Remove and discard each elbow back-up ring and
O-rings.

High-pressure Pump and IPR Valve

Figure 539 Removing the high-pressure pump
assembly
1. Remove two bolts (M8 x 100) behind pump and
two (M8 x 30) bolts securing the high-pressure
pump to the front cover. Remove pump assembly
and discard seal.
Figure 540 Removing the IPR valve
2. Use an IPR removal / installation tool (Table 48)
to remove the IPR valve. Check inlet screen for
restrictions. Remove O-rings and discard.
Read all safety instructions in the "Safety Information" section of this manual before doing any procedures.
FUEL SYSTEM

High-pressure Oil Rail Assembly

1. Remove valve cover. See (Valve Cover, page120 )
in the "Cylinder Head and Valve Train" section of
this manual.
Figure 541 Removing the injector harness
connector
2. Disconnect the injector harness connector at the
top of each injector.
death, get assistance to remove and install the
high-pressure oil rail assembly.
3. Remove
high-pressure oil rail to cylinder head.
Figure 542 Removing the high-pressure oil rail
4. Remove all bolts and lift high-pressure oil rail
up just enough to drain as much oil out of
high-pressure oil rail before lifting it away from
cylinder head.
EGES-265-2
Follow all warnings, cautions, and notes.
© 2009 Navistar, Inc.
WARNING: To prevent personal injury or
12
bolts
(M8
x
90)
securing

Advertisement

Table of Contents
loading

This manual is also suitable for:

International dt 570International ht 570

Table of Contents

Save PDF